Can I Sell My House With a Mechanic’s Lien on It?

Please enter your property address.
Ranch-style house undergoing renovation with lumber scraps outside, Nashville Tennessee

Your house was under contract. The title search came back clean. Then your attorney called: a contractor filed a mechanic’s lien three days ago. The buyer’s lender won’t fund until title is clear, and clear title means the lien has to go. Your closing date is in eighteen days.

This is a solvable problem. It is also a ticking clock, and which solution makes sense depends on how much time you have, how much the lien is for, and whether the contractor’s claim is legitimate.

Short answer: Yes — you can sell with a mechanic’s lien on the property, but most conventional buyers can’t close until it’s resolved. Cash buyers operate outside the lender’s title requirements and can often close before the enforcement window runs. Dispute the lien if the amount is wrong and you have 60+ days. Bond it off if you need to clear title fast and have $500–$2,000 for a surety bond. Sell as-is if neither option works.

What a mechanic’s lien actually does to a sale

A mechanic’s lien — also called a construction lien or contractor’s lien — is a legal claim a contractor, subcontractor, or supplier files against your property when they say they weren’t paid for work or materials. It’s recorded in your county’s real property records, which puts every future buyer and lender on notice that someone has a claim on the property.

The practical problem is title insurance. A title insurance underwriter will not issue a clean policy with an open mechanic’s lien recorded against the property. No clean title policy means no mortgage funding. No mortgage funding means no conventional buyer can close. The lien doesn’t have to be valid — it just has to be recorded — to block the closing.

This catches people off guard because the lien often appears after the house goes under contract. A subcontractor who wasn’t paid by the general contractor has the right to file directly against your property, even if you paid the GC in full. That’s the part most homeowners don’t know until it shows up on a title commitment. For a full picture of how different types of liens affect a sale — including IRS liens and HOA liens — see our guide to selling a house with a lien. This page covers contractor liens specifically.

How fast the clock is running

A mechanic’s lien that isn’t enforced eventually expires, but the window varies sharply by state. The lienor has to file suit within the statutory period or the lien becomes unenforceable — but that window can run up to a year, which is too long to wait if you need to close in the next 30 to 60 days.

  • Tennessee: 90 days after last work or materials to record the lien (TCA § 66-11-112); lienor must file suit within 1 year of recording (TCA § 66-11-126)
  • Texas: 15th day of the 4th calendar month after completion for the original contractor; shorter windows for subs and suppliers; suit within 2 years of recording (TX Property Code § 53.158)
  • Florida: 90 days after last work or materials to record (FL § 713.08); suit within 1 year of recording (FL § 713.22)

The enforcement window helps if you have years. It does not help if your buyer’s rate lock expires next month.

Three ways to handle it

Option 1: Dispute the lien

If the amount is inflated or the contractor didn’t follow the statutory notice requirements, you can challenge the lien’s validity. In Texas, a lien against a residential homestead is void if the written contract wasn’t signed by both spouses (TX Property Code § 53.254) — this is a frequent defect because contractors often present the work order to whoever answers the door. In Florida, a subcontractor who failed to serve a “Notice to Owner” within 45 days of starting work loses lien rights against the owner, even if they were genuinely underpaid (FL § 713.06).

Disputing a lien takes time. Even a fast resolution through a Notice of Contest (Florida) or a Show Cause filing takes 30 to 90 days. This option makes sense if you have that time and the defect is clear.

Option 2: Bond off the lien

Every state with a mechanic’s lien statute also has a mechanism for removing the lien from title by substituting a surety bond. The bond sits in place of the property as the lienor’s security, the lien is discharged from the real property records, and the sale closes with clean title.

  • Tennessee: TCA § 66-11-120 — bond at 125% of the claimed amount; file with the county clerk where the lien is recorded
  • Texas: TX Property Code § 53.171 — bond at 125%; file with county clerk and serve the lienor by certified mail
  • Florida: FL § 713.24 — bond equal to lien amount plus 25% for costs (minimum $500); clerk of court issues Certificate of Discharge

A surety bond for a $20,000 lien typically costs $500 to $2,000 depending on the bonding company and your credit. The bond removes the cloud on title so the sale can proceed — the contractor can still sue you on the bond, but the property is free and clear to transfer. Processing typically takes 5 to 10 business days.

Option 3: Sell to a cash buyer

Cash buyers don’t use a lender, so they don’t depend on a conventional title insurance policy. Some cash buyers are willing to close with a mechanic’s lien in place using a Mechanic’s Lien Endorsement from the title company, an escrow holdback equal to the lien amount, or by taking the property with the lien attached and resolving it post-close.

This is the fastest path when the dispute would outlast your closing window, the bond amount exceeds what you have available, or the contractor’s claim is legitimate and you’d rather move on than fight it. We buy houses as-is, which includes houses with contractor liens on them.

How the options compare

PathTime to clearOut-of-pocketWorks if lien is disputedWorks in 30 days
Dispute the lien30–90 days (best case)$500–$5,000 attorney feesYes, if defect existsRarely
Bond off the lien5–10 business days$500–$2,000 bond premiumYes — bond substitutes for propertyYes
Pay it at closingImmediate (from proceeds)Lien amount + interestNo — you’re paying the claimYes, if equity covers it
Sell to a cash buyer7–14 daysNo commissions, repairs, or feesYes — buyer assumes or escrowsYes

Tennessee: what the law looks like here

Tennessee’s mechanic’s lien statute (TCA § 66-11-101 through 66-11-139) gives contractors, subcontractors, and suppliers the right to file a lien on your property for unpaid work. The lien attaches to the property itself — meaning a buyer takes it on if title isn’t cleared before closing.

Key timelines in Tennessee:

  • Original contractor: 90 days from last work or materials delivered to record the lien with the Register of Deeds
  • Subcontractors and suppliers: same 90-day window, but must also serve a Notice of Lien Rights on the owner before recording — a step many subcontractors miss, which can void the lien
  • After recording: lienor has 1 year to file suit (TCA § 66-11-126); after that, unenforceable
  • Bonding off: TCA § 66-11-120 at 125% of the claimed amount

Register of Deeds locations: Davidson County at 501 Broadway, Nashville; Williamson County at 135 4th Ave S, Franklin; Rutherford County at 319 N Maple St, Murfreesboro; Sumner County at 355 N Belvedere Dr, Gallatin.

TCA § 66-5-202 requires disclosure of known liens to any buyer. A seller who knows about a recorded contractor lien and doesn’t disclose it faces potential contract rescission and damages. Disclose it and address it — that’s the only defensible path.

One scenario we’ve seen more than once: a full kitchen renovation in East Nashville or a bathroom gut job in Germantown, the GC takes the final payment and doesn’t pay the tile subcontractor, the sub files a lien six weeks later when the house is already under contract. The GC is unreachable. The sub isn’t going away. The buyer’s lender won’t fund.

If the sub missed the notice requirement and the disputed amount is under $10,000, the dispute is worth having. If the contractor’s paperwork is clean and the amount is real, bonding off or selling as-is is faster than waiting for a court resolution. If the renovation also turned up unpermitted work from the same project, those two problems frequently arrive together — see what happens when unpermitted work surfaces during a sale. We work throughout Tennessee — Nashville, Murfreesboro, Clarksville, Franklin, Brentwood, and surrounding counties — and buy houses statewide.

Texas: the homestead wrinkle

Texas has the most complex mechanic’s lien law in the country, and the homestead provisions are where most lien defects appear.

Under the Texas Constitution (Art. XVI, § 37) and TX Property Code Chapter 53, a lien can attach to a homestead only if there is a written contract signed by both spouses — even if only one spouse is on the deed (TX Property Code § 53.254). A contractor who had one spouse sign the work order has a defective lien. It doesn’t matter how much work was done. No dual signature, no valid homestead lien.

Filing deadlines in Texas are based on the last calendar month of furnishing: original contractor by the 15th day of the 4th calendar month after completion; subcontractors and suppliers by the 15th day of the 2nd calendar month (residential) or 3rd calendar month (commercial). Liens are filed with the County Clerk: Harris County at 201 Caroline, Houston; Dallas County at 500 Elm, Dallas; Tarrant County at 100 W Weatherford, Fort Worth; Bexar County at 100 Dolorosa, San Antonio. Bonding off under TX Property Code § 53.171 at 125% of the claimed amount.

Florida: the most complicated lien law in the country

Florida’s Construction Lien Law (FL § 713.001 through 713.37) gives lien rights directly to subcontractors and suppliers, not just to the contractor who signed the agreement with the homeowner. Two documents shape everything.

Notice of Commencement (§ 713.13): The owner must record a Notice of Commencement in the county official records before work begins. It identifies the property, the contractor, and the owner’s designated representative. If a Notice of Commencement wasn’t recorded, every downstream subcontractor and supplier retains full lien rights directly against the owner — even if the owner paid the GC in full.

Notice to Owner (§ 713.06): Subcontractors and suppliers must serve a Notice to Owner within 45 days of their first day on the job. A sub who missed this window loses lien rights against the owner. This is the most common defect in Florida and the first thing to check when disputing a Florida mechanic’s lien.

Florida-specific timeline:

  • Lien must be recorded within 90 days of last furnishing (§ 713.08)
  • Suit to enforce within 1 year of recording (§ 713.22)
  • Owner can serve a Notice of Contest of Lien, shortening the lienor’s suit window to 60 days (§ 713.22(2))
  • Bonding off under § 713.24: lien amount plus 25% for costs (minimum $500), filed with Clerk of Court

Florida’s construction boom in Hillsborough, Pinellas, Broward, Palm Beach, and Miami-Dade counties means contractor lien disputes are common. If a sub says they weren’t paid and files against your property, the first question is whether they served a Notice to Owner within 45 days. Many didn’t. That defect doesn’t make them wrong about the money — but it does mean they can’t enforce the lien against your property.

When you probably don’t need us

A cash sale isn’t the right answer for every contractor lien situation. Here’s when it probably isn’t:

  • The lien is under $5,000, the contractor missed a notice requirement, and you have 60+ days — dispute it, the defect is real and a demand letter from an attorney often resolves it without litigation
  • The lien is legitimate and can be paid from your equity at closing without wiping out your proceeds — most title companies can handle that at the settlement table with no additional complications
  • Your buyer is already a cash buyer with no lender and flexible timing — you may be able to close with the lien in place or in escrow

A cash offer from us will come in below what a fully-prepared house sells for through a traditional listing. That’s honest, and you should know it going in. We buy as-is — the lien, the deferred maintenance, and the complexity — but we’re not the right call if the math works in a conventional sale and you have the time to see it through.

If the contractor lien situation is pushing you toward a forced timeline, read about selling before a foreclosure — the deadline math is the same, and the options narrow the same way as the date gets closer.

What happens when you give us the address

Call (615) 780-7349 or put the address in the form below. We get back to you within 24 hours with a cash offer. We’ve bought more than 100 houses — including plenty with title complications that made a traditional listing impossible — and we work with a title company experienced in clearing contractor lien situations. If a lien can be resolved quickly before closing, we’ll handle it. If it’s faster to close with it in escrow, we can structure it that way.

You pick the closing date. Seven to fourteen days is typical. No agent commission — that’s 5 to 6% you keep — no repairs, no fees.

If you have an open mechanic’s lien and a closing that just fell through, give us a call. We’ve been here before.